DBE UTILITY SERVICES
PROJECT NAME STATUS FINISH DESCRIPTION
LAS OLAS BRIDGE 20-IN WM & 16-IN FM 2 BORES Complete 9/30/2016 2 BORES TOTAL 3000 LF- ONE 1,250 LF 20" HDPE DR9 WATER MAIN AND ONE 1,250 LF 16" HDPE DR9 SEWER FM
CITY BOYNTON BEACH 36IN WM W/42IN HDD Complete 9/23/2016 THREE BORES TOTAL - RAW WATER MAIN HDD BORES 1-42" 2600 LF, 1-42" 1,300 LF, AND 1-42" 1,600 LF. TOTAL OF 3 SHOTS AND 5,500 LF TOTAL.

OPEN CUT: DIP: 37 LF OF 36", 695 LF OF 24", 20 LF OF 18". 10 LF OF 12", 39 LF OF 8"; 2" SCH 40, 24", 12" 18" AND 8" GATE VALVES, FITTINGS AND ELECTRICAL PULL BOX
PLANTATION 4 IN HDD Complete 6/30/2016 4" PE 385 LF
4" PE 415 LF
SEACOAST UTILITY 16 IN RWM HDD PBG Complete 6/27/2016 TWO BORES 2,000 LF TOTAL.  BORE #1 - INSTALLATION OF APPROXIMATELY 1,000 LINEAR FEET OF TWO (2) INCH FIBER-OPTIC CONDUIT WITH PULL BOXES RUNNING PARALLEL TO THE PROPOSED 16-INCH RAW WATER MAIN. BORE #2 - A 2-INCH FIBER-OPTIC CONDUIT INSTALLED VIA HDD METHODS AND OPEN CUT.
45TH ST. 4IN & JW CHEATHAM METERING STA Complete 4/22/2016 INSTALL 2000 LF OF 4" STEEL GAS MAIN VIA HDD, INSTALL 8000 LF 4" STEEL GAS MAIN VIA OPEN CUT METHOD, 12" MUELLER FITTING, REMOVE AND REPLACE CONCRETE AND ASPHALT, INSTALL 4" STEEL FITTING, REPLACE SOD, SEED AND STRAW
ISLAMORADA CREEKSIDE 2 IN Complete 4/22/2016 INSTALL 2" PE VIA HDD 1,342 LF
63RD ST MIAMI 20IN WIRELINE HDD Complete 4/1/2016 INSTALL 820 LF OF 20" HDPE VIA HDD, INCLUDING WIRELINE GUIDANCE, AND FUSING OF HDPE.
HECKSCHER DRIVE 24" STEEL REPLACEMENT Complete 3/18/2016 INSTALL APPROXIMATELY 1,090 LF OF 24" STEEL GAS MAIN WITH ALL REQUIRED APPURTENANCES VIA HDD UNDER I295, 250 LF OF 2" STEEL GAS MAIN; 400 LF OF 4" STEEL GAS MAIN VIA OPEN CUT. JT100 DRILL. ABANDOMENT & GROUT 24 IN PIPE 1600 LF. NOV 2015-MARCH 2016
PINE ISLD 15-019 HDD 4IN 10IN Complete 1/29/2016 INSTALL 2,190 LF OF 4" HDPE FORCE MAIN, 1,621  LF OF 10" HDPE WATER MAIN VIA HDD, SOFT DIGS WITH STIRLING RD
HDD 800 LF UNDER I95 Complete 1/22/2016 INSTALL APPROXIMATELY 800 LF OF 18" HDPE AND 16" DI PIPE POTABLE WATER MAIN WITH FUSEABLE AND MECHANICAL JOINT FITTINGS AND VALVES IN A ROUGHLY EAST/WEST ALIGNMENT VIA HDD UNDER INTERSTATE I-95. 1/1/2016-1/23/16
GORDON RIVERS 2 HDD BORES 6IN NAPLES Complete 1/15/2016 INSTALL APPROXIMATELY 2,725 +/- OF 6" STEEL PIPE X .188 WALL X-52 WITH POWERCRETE COATING (SEP). TWO SEPARATE BORES OF 1250' (NORTH BRIDGE) AND 1325' (SOUTH BRIDGE) ON THE EAST SIDE OF US 41; INCLUDES 3 TIE INS. 12/7/15-1/15/16
FPL KILLIAN FEEDER Complete 1/11/2016 INSTALL VARIOUS HDPE DUCTS COMBINATIONS BY HDD AT VARIOUS DEPTHS. 11/30/15-
DESOTO-8IN UNDER MANATEE RIVER SARASOTA Complete 1/2/2016 INSTALL VARIOUS HDPE DUCTS COMBINATIONS BY HDD AT VARIOUS DEPTHS. TWO BORES 2,525' OF 8" HDPE UNDER MANATEE RIVER-SUBAQUEOUS; AND 850' OF 6" HDPE. 12/7/15-1/2/16. FPL WR#4109853
FPL VANDERBILT BEACH UTILITY CONVERSION, COLLIER COUNTY Complete 12/4/2015 INSTALLATION OF VARIOUS HDPE DUCTS COMBINATIONS BY HDD AT VARIOUS DEPTHS. 2" - 24". 1-6" TRUTRACKER WIRELINE BORE 757 LF AND 1-24" TRUTRACKER WIRELINE BORE 760 LF UNDER WIGGINS WATERWAY. SUBAQUEOS.
15-215 SLB DYER BLVD 6 IN FM REPLACEMENT Complete 11/13/2015 INSTALL 550 LF OF 6" FORCE MAIN HDPE WITH 14" CASING PIPE VIA HDD UNDER TURNPIKE, INSTALL 400 LF OPEN CUT, ARV CONSTRUCTION, REMOVE EXISTING FORCE MAIN, MOT, TESTING. 
I-75 WM XING I-75 & UNIVERSITY PKWY Complete 11/12/2015 INSTALLATION OF WATER MAIN, CONNECTION TO EXISTING 12" & 16" WATER MAINS USING C905; 800 LF OF 18" C905 VIA HDD UNDER I-75, AND ALL PIPE FITTINGS, VALVES, VALVE BOXES, RESTORATION. 100LF OF 16” AND 43LF OF 12” VIA OPEN CUT. 10/12/15-12/26/15
WINTER PARK SOUTH GAS MAIN SERVICES 15-Y14225 Complete 11/6/2015 INSTALL APROXIMATE 26,770 LF OF 2" HDPE, 1,400 LF OF 4" HDPE, TESTING AND TAPPING OF NEW MAIN LINE, MAKE ALL TIE INS, 141 EA INSTALL ¾” – 1 ¼” HDPE LONG SIDE SERVICE, INCLUDING FUSION ON RISER, CONNECTION AT MAIN, TESTING AND TAPPING. 65 EA INSTALL ¾” – 1 ¼” HDPE SHORT SIDE SERVICE, INCLUDING FUSION ON RISER, CONNECTION AT MAIN, TESTING AND TAPPING.
FPL GRATIGNY FEEDER HIALEAH Complete 10/22/2015 HORIZONTAL DIRECTIONAL DRILL APPROXIMATELY 2,800' OF 1-6" HDPE DUCT COMBINATIONS.
FPL BRICKELL SUBSTATION MIAMI Complete 10/2/2015 HORIZONTAL DIRECTIONAL DRILL APPROXIMATELY 400' OF 12-6" HDPE DUCT COMBINATIONS. 
SR7 (SOUTH) GAS LINE REPLACEMENT PROJECT MIAMI  Complete 9/25/2015 INSTALLATION AND RELOCATION OF GAS LINE PIPE RANGING IN SIZE FROM 1/2" TO 6" INCLUDING COMMERCIAL AND RESIDENTIAL SERVICES. ASPHALT REPLACEMENT, MOT.
FPL POLO FEEDER-SARASOTA Complete 9/18/2015 HORIZONTAL DIRECTION DRILL VARIOUS SIZES OF HDPE DUCT COMBINATIONS, APPROXIMATELY 400 LF OF 1-6", 1685 LF OF 2-6", AND 1660 LF OF 9-6".
NORTH LOOP MURRAY CREEK  Complete 9/11/2015 HDD APPROXIMATELY 800 LINEAR FEET OF 6” HDPE (HIGH DENSITY POLYETHYLENE) WATER MAIN ALONG ART CENTER AVENUE, FROM BROOKLINE AVENUE TO U.S. 1, APPROXIMATELY 5 FEET NORTH OF THE EDGE OF PAVEMENT, UNDER MURRAY CREEK. AND INSTALL (2) AIR RELEASE VALVES AND VAULTS ON EITHER SIDE OF MURRAY CREEK.
2 IN HDPE BORE 905 LF APPROX Complete 8/17/2015 INSTALL APPROXIMATELY 905 LF OF 2" HDPE 
WVWS RECLAIMED WATER INTERCONNECTS PART A&B BID NO. 15-01 PART A ORANGE CAMP RD & MLK  Complete 8/7/2015 HDD 1,900 LF OF 18" HDPE DR11 AND 3,000 LF OF 16" HDPE DR11
BROADSTONE HARBOR 12" HDPE WATER MAIN  Complete 8/1/2015 BORE 280' OF 12" HDPE WATER MAIN 
SOUTH PLANTATION KEY DECENTRALIZED SYSTEM (KEYS LOW PRESSURE SEWER SYSTEMS) Complete 7/31/2015 INSTALL 2000' OF LOW PRESSURE MAINS RANGING IN SIZE 3" AND 2". SERVICE LATERAL KITS 1 1/4" WITH GRINDERS, 4 SERVICES TOTAL.
INSTALL 3000' OF LOW PRESSURE MAINS RANGING IN SIZE 6", 4", 2", AND 1 1/2". SERVICE LATERAL KITS 1 1/4" TO 4" IN SIZE  WITH GRINDERS, 21 SERVICES TOTAL
ALL ABOARD RR PROJECT Complete 6/16/2015 INSTALL ONE (1), 4” HDPE DUCT FOR APPROXIMATELY 25,000 LF (~900 LF IN FT. LAUDERDALE AND ~1,600 LF IN WEST PALM BEACH) AS SHOWN IN THE PLANS PROVIDED BY ALL ABOARD FLORIDA.
NORRIS CUT MIAMI TUNNEL 10 IN HDPE BORE 925 LF (FISHER ISLD) Complete 5/30/2015 INSTALL 10" HDPE DR 11 FORCE MAIN APPROX 925 LF. TRACER WIRE WILL NEED AN EXTRA 2" DR 9 HDPE CONDUIT TO ENSURE CONDUCTIVITY. WIRELINE GUIDANCE.
ST. CLOUD RECLAIMED WATER MAIN PHASE I Complete 4/17/2015 RECLAIMED WATER MAIN: INSTALL 2,241’ OF 24” HDPE BY HDD, 2,837’ OF 16” HDPE BY HDD AND 1,080’ OF 12” HDPE BY HDD. INSTALL 620’ OF 24” C-905 BY OPEN CUT, 3,222’ OF 16” C-905 BY OPEN CUT, AND 530’ OF 12” C-905 BY OPEN CUT. ALL PIGGING, TESTING AND CONNECTIONS TO EXISTING LINES. 1-900' SHOT OF 24" HDPE AND 1-800' SHOT OF 16" UNDER CANAL SUBAQUEOS.
HYPOLUXO ISLAND  Complete 2/1/2015 PERFORMED A SUBAQUEOUS WIRELINE BORE 1,400 LF of 8 IN STEEL FROM EAST SIDE OF LANTANA BRIDGE 50' UNDER THE LAGOON TO THE EAST SIDE OF A1A. DITCH WITCH JT100;INROCK MUD MOTOR; AMERICAN AUGER MCM4000
FLORIDA KEYS, CONVEYANCE FORCE MAIN Complete 11/1/2014 INSTALL APPROX 12,000 LF OF 12-IN FM VIA SLIP-LINING
FLORIDA KEYS, CONVEYANCE FORCE MAIN Complete 10/1/2014 INSTALL 7000 LF OF 10" HDPE SEWER FORCE MAIN
FLORIDA KEYS, SEWER CONVEYANCE MAINS Complete 10/1/2014 7,000 LF OF 12" HDPE. BORES RANGED IN SIZE FROM 300' - 1200'. INCLUDED WAS 7,500' OF LOW PRESSURE SEWER MAINS INSTALLED WITH ARV'S, FLUSHING AND CONNECTIONS, AND 75 SERVICES TO GRINDER STATIONS. SEPT 2014-OCT 2014
TECO/WINTER PARK GAS LINE REPLACEMENT Complete 10/1/2014 RESIDENTIAL GAS LINE REPLACEMENT PHASE I
16" RAW WATER MAIN FROM NEW WELL Complete 7/1/2014 INSTALL 1,400 LF OF 16" HDPE RAW WATER MAIN VIA HDD. ALL PIPING, TESTING AND CONNECTIONS TO EXISTING LINES, FDOT.
WHALE HARBOR BORE Complete 4/30/2014 INSTALL 14" HDPE FORCE MAIN IN FRONT OF WHALE HARBOR. BORE WAS 800'.
FLORIDA KEYS, SEWER WATER CROSSING Complete 3/1/2014 7 BORES RANGING IN SIZE FROM 1,200' TO 2,400' IN LENGTH; WIRE LINE BORES 18" AND 10" HDPE. SEPT 2013-MARCH 2014
LIGHTHOUSE DRIVE GAS REPLACEMENT Complete 9/1/2013 INSTALL 6" GAS MAIN/OVER 700 LF IN A SINGLE PULL
5 CHANNEL CROSSING BORES Complete 10/1/2012 BORE 12" PIPE, 2,800' IN LENGTH. SEPT 2012-OCT 2012
LINE EXTENSION ANNEX SERVICE ORDER CONTRACT Complete INSTALLATION OF VARIOUS PIPE SIZE COMBINATIONS VIA HDD RANGING FROM 1.25" - 2" PLASTIC PIPE; 4"-6" STEEL PIPE; 
VTMI NW 28TH STREET Complete 4" HDPE PIPE
BLANKET; SPECIAL PROJECTS DIVISION Complete $2 MILLION (ANNUALLY): HDD GAS LINE REPLACEMENT INSTALLATIONS ALONG WITH REGULATOR STATION, GATE STATION, METERING, GPR, WELDING & TESTING FOR SPECIAL PROJECTS. 3 BORES COMPLETE AS OF 8/15/16
UPPER MATECUMBE DECENTRALIZED SYSTEM (KEYS LOW PRESSURE SEWER SYSTEMS) Complete
LANDSTREET RD 6 IN STEEL PIPE IP 11/30/2016 INSTALL 6" STEEL PIPE 15,700 LF WITH ALL REQUIRED APPURTENANCES
CRANBERRY COCOPLUM 12-IN HDPE WM IP 10/21/2016 BORE 12" HDPE DR 11 HDPE WATER MAIN 355 LF, CONNECT TO EXISTING POTABLE WMS, TIE-IN 12" HDPE WATER MAIN TO EXISTING, REMOVE AND DISPOSE OF BRIDGE SUPPORTED BY WM, GROUT, CAP AND ABANDON EXISTING WMS, PRESSURE TESTING, 2" AIR RELEASE ASSEMBLY
VENETIAN ISLAND BORES 5 TOTAL IP INSTALLATION OF ALL VALVES, FITTINGS, ELECTRONIC MARKERS, TRACER WIRE, PRESSURE TESTING, PIGGING, TAPPING, BLOWING, TIE-INS TO EXISTING NATURAL GAS DISTRIBUTION SYSTEM, ASPHALT/CONCRETE REMOVAL AND DISPOSAL, HORIZONTAL & VERTICAL OFFSETS, DEWATERING, AND MOT  TO INSTALL 5 BORES, 8,500 LF TOTAL. SUBAQUEOS. DESIGN BUILD.
DBE UTILITY SERVICES
DBE UTILITY SERVICES
DBE UTILITY SERVICES
DBE UTILITY SERVICES
DBE UTILITY SERVICES
DBE UTILITY SERVICES
DBE UTILITY SERVICES